DOWNLOADS
HOME
---------------------------
PROJECT DEVELOPMENT
---------------------------
COMMUNITY
CONSULTATION
---------------------------
PHOTO GALLERY
---------------------------
PLANNING APPROVALS
---------------------------
EXPLORATION LICENCE
---------------------------
MAJOR PROJECT
APPLICATION
---------------------------
DOWNLOADS
---------------------------
NEWSLETTERS
---------------------------
CONTACT US
---------------------------
DISCLAIMER
Environmental Assessment report
Volume 1
Table of Contents and Executive Summary
Section 1 - Introduction
Section 2 - Project Approval Framework
Section 3 - Stakeholder and Community Consultation
Section 4 - Project Description
Section 5 - Existing Environment and Interactions
Section 6 - Draft Statement of Commitments
Section 7 - Project Justification and Conclusions
Section 8 - References
Section 9 - Abbreviations
Volume 2
Plan 1 - Locality Plan
Plan 2 -EL6288 & Development Application Area
Plan 2a - Land Ownership
Plan 3 General Arrangement
Plan 4 - Main Infrastructure Area
Plan 5 - MCP at 6 months
Plan 6 - MCP at 2 years
Plan 7 - MCP at 5 years
Plan 8 - MCP at 8 years
Plan 9 - MCP at 10 years
Plan 10 - Open Cut 1 Access & Conveyor Arrangement
Plan 11 - Underground No. 4 Longwall Layout & Staging
Plan 12 - Schematic of Proposed Water Management Strategy
Plan 12a - Surface Water Management in Main Infrastructure Area
Plan 13 - Environmental Baseline Monitoring Locations
Plan 14 -Year 2 - Predicted Annual Average PM
10
Dust Emissions
Plan 15 - Year 5 - Predicted Annual Average PM
10
Dust Emissions
Plan 16 - Year 8 - Predicted Annual Average PM
10
Dust Emissions
Plan 17 - Year 10 - Predicted Annual Average PM
10
Dust Emissions
Plan 18 - Year 1 - Predicted LAeq(15 minute) noise levels - ENE wind
Plan 19 - Year 2 - Predicted LAeq(15 minute) noise levels - ENE wind
Plan 20 - Year 6 - Predicted LAeq(15 minute) noise levels - ENE wind
Plan 21 - Year 8 - Predicted LAeq(15 minute) noise levels - start of Pit 3 (inversion)
Plan 22 - Year 10 - Predicted LAeq(15 minute) noise levels - end of Pit 3 (inversion)
Plan 23 - Regional Hydrological Units
Plan 24 - Existing Groundwater levels within Ulan Seam - Permian Coal Measures
Plan 25 - Moolarben Groundwater Investigation Surficial Groundwater contours
Plan 26 - Predicted Drawdowns - Ulan Seam at completion of Mining (2022-2023)
Plan 27 - Conceptual Stormwater Management at 6 months
Plan 28 - Conceptual Stormwater Management at 10 Years
Plan 29 - Surface Level features above Underground No. 4
Plan 30 - Predicted Subsidence levels for Underground No. 4
Plan 31 - Soil Type Boundaries
Plan 32 - Land Capability
Plan 33 - Agricultural Suitability
Plan 34 - Terrestrial Stratification Units
Plan 35 - Vegetation Associations
Plan 36 - Threatened Flora Species
Plan 37 - Endangered Ecological Communities
Plan 38 - Threatened Fauna Species
Plan 39 - Preferred Final Land Use and Mitigation Strategy
Plan 40 - Aboriginal Heritage Locations
Plan 41 - European Heritage Locations
Plan 42 - Visual Impact from Ulan Village
Appendix
Appendix 1 - Director General Requirments
Appendix 2 - Newsletters
Appendix 3 - Air Quality
Appendix 3a - Health Risk Assessment
Appendix 4 - Noise and Blasting
Appendix 4a - Amendment Figure 17
Appendix 5 - Groundwater
Appendix 6 - Surface Water
Appendix 7 - Flooding
Appendix 8 - Subsidence
Appendix 9 - Soils, Land Capability and Agricultural Suitability
Appendix 10 - Geochemical
Appendix 11 - Flora, Fauna and Aquatic Ecology
Appendix 12 - Aboriginal Heritage
Appendix 13 - European Heritage
Appendix 14 - Socio Economic Analysis
Appendix 15 - Traffic
Appendix 16 - Preliminary Hazard Analysis
Appendix 17 - Visual Impact
FELIX RESOURCES LIMITED | Copyright © 2007
Last modified: 19/05/2008