Moolarben Open Cut Optimisation Modification
The Modification involves optimisations to approved Stage 1 and Stage 2 operations at the Moolarben Coal Complex.
The key element of the Modification is an increase in run-of-mine (ROM) coal production from the Stage 1 and Stage 2 open cuts (OC1 to OC4). The Modification also involves a minor extension to the OC2 pit limit, minor extensions and reductions of the OC3 pit limits, rehabilitation, water management and relocated/additional surface infrastructure.
Further information on the modification can be found below
-
Executive Summary
8.98 MB | pdf -
Environmental Assessment
9.08 MB | pdf -
Attachment 2 ‐ Stage 1 Project Approval (05_0117)
4.25 MB | pdf -
Attachment 3 ‐ Stage 2 Project Approval (08_0135)
2.98 MB | pdf -
Appendix A ‐ Noise Assessment
3.29 MB | pdf -
Appendix B ‐ Air Quality Assessment
4.35 MB | pdf -
Appendix C ‐ Biodiversity Assessment Review
6.34 MB | pdf -
Appendix D ‐ Aboriginal Cultural Heritage Assessment
9.52 MB | pdf -
Appendix F ‐ Controlled Water Release Impact Assessment
2.46 MB | pdf -
Appendix G ‐ Aquatic Ecology Assessment
18.3 MB | pdf -
Appendix H ‐ Geochemistry Review
2.04 MB | pdf -
Appendix I ‐ Groundwater Assessment
6.17 MB | pdf -
Response to Submissions
4.21 MB | pdf